AC Condensate Drain Calculator: Drain Pipe Size by Capacity

Enter the cooling capacity in TR, kW or BTU/hr and the number of units on the drain to get the minimum condensate drain pipe size from the International Mechanical Code, the larger size common design practice uses, the condensate flow you can expect, and the trap dimensions for the static pressure at the drain pan.

IMC Section 307ASHRAE HandbookUPC / local plumbing code

Inputs

1

Cooling equipment

Identical units sharing one drain line
Comfort cooling 20–35% · humid climate or high fresh air 35–50%
2

Trap

Negative pressure of a draw-through unit, as a positive number — used for the trap dimensions

How to Size an AC Condensate Drain

A cooling coil removes moisture from the air, and that water has to leave the unit by gravity through a small pipe that carries almost no pressure. Because the flow is tiny, drain lines are not sized by hydraulics but by a code table based on equipment capacity — the pipe is deliberately much larger than the flow needs, so that algae, dust and slime do not block it.

Drain size = from IMC Table 307.2.2, by total cooling capacity on the drain (never smaller than the unit connection)
Condensate flow (L/h) = capacity (kW) × latent share ÷ 2,465 kJ/kg × 3,600
1 TR = 12,000 Btu/h = 3.517 kW · rule of thumb: 1–2 L/h per TR (0.3–0.5 gph per ton)
Slope ≥ 1% — ⅛ in per ft (10 mm per metre) — toward the discharge

Condensate Drain Pipe Size Chart

Equipment capacityIMC minimum sizeCommon design practiceCondensate at 30% latent
Up to 5 TR (17.6 kW)¾ in (DN20)¾ in (DN20)up to 7.7 L/h (2.0 gph)
5 – 10 TR (35 kW)¾ in (DN20)1 in (DN25)up to 15.4 L/h (4.1 gph)
10 – 20 TR (70 kW)¾ in (DN20)1¼ in (DN32)up to 30.8 L/h (8.1 gph)
20 – 40 TR (141 kW)1 in (DN25)1½ in (DN40)up to 61.6 L/h (16.3 gph)
40 – 80 TR (281 kW)1¼ in (DN32)2 in (DN50)up to 123 L/h (32.6 gph)
90 – 125 TR (440 kW)1½ in (DN40)2½ in (DN65)up to 193 L/h (50.9 gph)
125 – 250 TR (879 kW)2 in (DN50)3 in (DN80)up to 385 L/h (102 gph)

IMC column: International Mechanical Code Table 307.2.2 (up to 20 tons ¾ in, over 20 to 40 tons 1 in, over 40 to 90 tons 1¼ in, over 90 to 125 tons 1½ in, over 125 to 250 tons 2 in). The design-practice column is the more generous sizing many consultants and manufacturers specify. Local plumbing and mechanical codes may differ — the adopted code governs.

Slope, Traps and Materials

  • Slope. At least 1% (⅛ in per ft, about 10 mm per metre) in the direction of flow, with no sags. Where the ceiling void cannot give that fall, use a condensate pump rather than a flatter pipe.
  • Trap on draw-through units. When the fan is downstream of the coil, the drain pan is under negative pressure and air is sucked back up an untrapped drain, holding the water in the pan until it overflows. The trap drop (pan outlet to trap outlet) should be the negative static pressure in inches of water plus 1 in, and the water seal half of that. For 1 in.wg: a 2 in drop and a 1 in seal.
  • Blow-through units have positive pressure at the pan; the trap stops conditioned air blowing out. Its seal depth should exceed the positive static pressure.
  • One trap per unit. Do not connect several units to a single trap, and vent the common line downstream of the traps so one unit cannot siphon another.
  • Materials. PVC, CPVC, copper, galvanized steel and polyethylene are all accepted; insulate the first section and any run through unconditioned space where the pipe surface can fall below the room dew point — check with the Dew Point Calculator.
  • Discharge. To an approved place of disposal through an air gap or air break — never directly into a sewer or soil stack. A secondary (overflow) drain or a float switch is required where a blocked drain would damage the building.

Worked Example: 10 TR Packaged Unit

  1. Capacity 10 TR = 35.2 kW = 120,000 Btu/h, one unit on the drain.
  2. IMC Table 307.2.2: up to 20 tons → ¾ in (DN20) minimum. Common practice for 5–10 TR: 1 in (DN25).
  3. Condensate at a 30% latent share: 35.2 × 0.30 ÷ 2,465 × 3,600 = 15.4 L/h (4.1 gph) — about 370 L per day at full load.
  4. Draw-through unit with −1.0 in.wg at the pan: trap drop = 1.0 + 1 = 2 in (51 mm), water seal = 1 in (25 mm).
  5. Run the pipe at 1% fall: a 12 m run needs 120 mm of drop.

For a full drain network with several branches, flow rates and pipe gradients, use the AC Condensate Drain Pro Calculator. To find the capacity in the first place, see the AC Tonnage Calculator or the Cooling Load Calculator; a spreadsheet version is in the AC condensate drain calculator (Excel) post.

Frequently asked questions

What size drain pipe does an air conditioner need?

The International Mechanical Code sets the minimum by capacity: ¾ in (DN20) up to 20 tons, 1 in over 20 to 40 tons, 1¼ in over 40 to 90 tons, 1½ in over 90 to 125 tons and 2 in over 125 to 250 tons. The pipe must never be smaller than the drain connection on the unit, and many designers go one size larger.

How much condensate does an AC unit produce?

Roughly 1 to 2 litres per hour for each ton of refrigeration (0.3 to 0.5 US gallons per hour per ton) in comfort cooling, more in humid climates or with a lot of fresh air. A 10 TR unit with a 30% latent load makes about 15 L/h, or 370 litres a day at full load.

What slope should a condensate drain line have?

At least 1%, which is ⅛ in per foot or about 10 mm per metre, falling continuously toward the discharge point with no dips. If the available height cannot give that fall, install a condensate pump.

Why does a condensate drain need a trap?

In a draw-through unit the drain pan is at negative pressure. Without a water seal, air is drawn up the drain pipe and stops the water leaving, so the pan overflows. The trap drop should equal the negative static pressure in inches of water plus 1 in, with a seal of half that depth.

Can several AC units share one condensate drain?

Yes. Size the common pipe for the total capacity connected to it, give every unit its own trap, and vent the common line after the traps. Each branch is sized for its own unit.

How do I convert tons to kW for drain sizing?

One ton of refrigeration is 12,000 Btu/h or 3.517 kW. A 35 kW unit is 35 ÷ 3.517 = 10 TR, and a 60,000 Btu/h unit is 5 TR.

References & standards

  • International Mechanical Code, Section 307 - Condensate Disposal (Table 307.2.2 drain sizing, 1% slope, traps, auxiliary drains)
  • ASHRAE Handbook - HVAC Systems and Equipment (air-handling unit drain pans and traps)
  • Uniform Plumbing Code / local plumbing code - indirect waste and condensate disposal
  • Equipment manufacturers’ installation manuals - drain connection size and trap dimensions

Results are preliminary engineering estimates. The edition of each standard adopted locally, the product listings and the authority having jurisdiction govern the final design.

Comments

0 comments

Found a number that looks wrong, or a case the tool does not cover? Say so here — corrections are welcome and get answered.

No comments yet. Be the first to add one.