Work out what a standpipe system must deliver. Choose the class and the number of standpipes to get the NFPA 14 flow demand — 500 gpm for the most remote riser plus 250 gpm for each additional one, capped at 1,000 or 1,250 gpm — then enter the height and pipe run for the pressure needed at the pump, a check against the 175 psi and 350 psi limits, and the 30-minute water supply.
| Class | Hose connection | Intended user | Flow | Residual pressure |
|---|---|---|---|---|
| Class I | 2½ in (65 mm) hose valves | Fire department and trained brigades | 500 gpm for the first standpipe + 250 gpm for each additional | 100 psi (6.9 bar) |
| Class II | 1½ in (40 mm) hose stations with hose and nozzle | Trained building occupants | 100 gpm (379 L/min) | 65 psi (4.5 bar) |
| Class III | Both 2½ in valves and 1½ in hose stations | Fire department and occupants | As Class I | 100 psi (6.9 bar) at the 2½ in outlet |
The Class I flow is taken at the hydraulically most remote standpipe: 250 gpm from each of its two highest hose connections, with 100 psi remaining at the outlet of the top one. A standpipe can also be automatic (the water supply delivers the demand without anyone acting) or manual (the fire department pumps into it through the fire department connection), and wet or dry. High-rise buildings need automatic wet systems.
| Standpipes (Class I or III) | Fully sprinklered building | Not sprinklered throughout | 30-minute supply |
|---|---|---|---|
| 1 | 500 gpm (1,893 L/min) | 500 gpm | 15,000 gal (56.8 m³) |
| 2 | 750 gpm (2,839 L/min) | 750 gpm | 22,500 gal (85.2 m³) |
| 3 | 1,000 gpm (3,785 L/min) | 1,000 gpm | 30,000 gal (113.6 m³) |
| 4 or more | 1,000 gpm (3,785 L/min) — maximum | 1,250 gpm (4,731 L/min) — maximum | 30,000 / 37,500 gal (113.6 / 141.9 m³) |
Where a floor area exceeds 80,000 ft² (7,432 m²), the second most remote standpipe is also designed for 500 gpm, so two standpipes need 1,000 gpm; the maximums still apply. In a fully sprinklered building the sprinkler demand is not added — the water supply is sized for the larger of the two. Class II systems need 100 gpm regardless of the number of hose stations.
Height is what drives a standpipe design. Every 10 ft of building adds 4.33 psi, so the pressure that gives 100 psi on the roof is far too high at ground level. NFPA 14 handles this with three limits:
As a rule of thumb, with 100 psi needed at the top and about 10 psi of friction, a single zone reaches the 175 psi threshold at roughly 150 ft (46 m) of height and the 350 psi limit at roughly 550 ft (168 m).
Building codes decide when a standpipe is needed. Under the International Building Code, standpipes are required where the floor of the highest storey is more than 30 ft (9.1 m) above the lowest level of fire department vehicle access, or the lowest storey is more than 30 ft below it, as well as in large assembly occupancies, covered malls, stages and underground buildings. Local codes differ, so confirm the trigger with the authority having jurisdiction.
At churn the pump pressure will be higher than 172 psi, so the lower hose valves in this building would still need pressure-regulating devices — check with the Fire Pump Selection Calculator. Use the Fire Hydraulic Calculator for the segment-by-segment friction loss and the Fire Water Tank Calculator for storage. Riser diagrams and hose cabinet details are in the fire fighting CAD details.
For Class I and III systems NFPA 14 requires 500 gpm for the hydraulically most remote standpipe plus 250 gpm for each additional standpipe, up to a maximum of 1,000 gpm in a fully sprinklered building and 1,250 gpm in a building that is not sprinklered throughout. Class II systems require 100 gpm.
100 psi (6.9 bar) residual at the outlet of the hydraulically most remote 2½ in hose connection while it flows 250 gpm and the standpipe flows 500 gpm, and 65 psi (4.5 bar) at the most remote 1½ in Class II hose connection flowing 100 gpm.
Class I provides 2½ in hose connections for the fire department. Class II provides 1½ in hose stations, with hose and nozzle, for trained occupants. Class III provides both. Class I and III use the same flow and pressure; Class II needs 100 gpm at 65 psi.
NFPA 14 requires a listed pressure-regulating device where the static pressure at a 2½ in hose connection exceeds 175 psi (12.1 bar), and where the residual pressure at a 1½ in occupant hose connection exceeds 100 psi (6.9 bar). No part of the system may exceed 350 psi (24.1 bar), which sets the height of each zone.
Class I and Class III standpipes must be at least 4 in (DN100). Standpipes combined with a sprinkler system must be at least 6 in (DN150), unless the building is sprinklered throughout and the combined system is hydraulically calculated, in which case 4 in is permitted.
NFPA 14 requires the supply to deliver the system demand for at least 30 minutes. Two Class I standpipes at 750 gpm need 22,500 gal (85.2 m³); the 1,000 gpm maximum for a sprinklered building needs 30,000 gal (113.6 m³).
Add the required residual pressure at the top outlet, the elevation pressure (0.433 psi per foot of height) and the friction loss in the pipe at the demand flow, then subtract any suction pressure. For 100 psi at the top of a 150 ft riser with 6.7 psi friction: 100 + 65 + 6.7 = 172 psi at the pump discharge.
Results are preliminary engineering estimates. The edition of each standard adopted locally, the product listings and the authority having jurisdiction govern the final design.
Found a number that looks wrong, or a case the tool does not cover? Say so here — corrections are welcome and get answered.