Turn a system demand into a fire pump rating. Enter the demand flow, the pressure needed at the most remote outlet, the elevation, friction loss and the suction pressure; the calculator picks the NFPA 20 rated capacity, rounds the rated pressure, checks the churn and 150% curve points, estimates the motor or engine size, and suggests jockey pump and pressure switch settings — in US or metric units.
A fire pump is rated by two numbers: the flow it delivers and the net pressure it adds at that flow. The flow comes from the largest system demand; the pressure is whatever the supply cannot provide on its own.
The suction pressure is the pressure available at the pump inlet while the demand is flowing — the residual pressure of a city main from a flow test, or the static head of a tank at its lowest level. Using the static (no-flow) pressure of a city main here is the most common way to undersize a pump.
| gpm | L/min | gpm | L/min | gpm | L/min |
|---|---|---|---|---|---|
| 25 | 95 | 400 | 1,514 | 2,000 | 7,570 |
| 50 | 189 | 450 | 1,703 | 2,500 | 9,462 |
| 100 | 379 | 500 | 1,892 | 3,000 | 11,355 |
| 150 | 568 | 750 | 2,839 | 3,500 | 13,247 |
| 200 | 757 | 1,000 | 3,785 | 4,000 | 15,140 |
| 250 | 946 | 1,250 | 4,731 | 4,500 | 17,032 |
| 300 | 1,136 | 1,500 | 5,677 | 5,000 | 18,925 |
Because a listed pump must deliver 150% of its rating, NFPA 20 allows the system demand to be anywhere up to 150% of the rated capacity. Selecting the rating at or just above the demand keeps a reserve for future changes; selecting near 150% gives a smaller, cheaper pump with no reserve. Most designers aim for a demand between 90% and 140% of rated flow.
| Point | Flow | Net pressure | What it controls |
|---|---|---|---|
| Churn (shutoff) | 0% | Not more than 140% of rated | Maximum pressure on pipe, fittings and sprinklers |
| Rated | 100% | 100% of rated | The nameplate duty |
| Overload | 150% | Not less than 65% of rated | Reserve capacity; the test header flow |
Add the highest static suction pressure to the churn pressure to find the greatest pressure the system can see. Where it exceeds 175 psi (12.1 bar) — the rating of standard sprinklers, fittings and valves — the options are a pump with a flatter curve, higher-rated components, a variable speed driver, or zoning. NFPA 20 does not accept a pressure relief valve as the normal means of controlling pressure.
| Pump rating | Water power | Brake power at 70% | Driver with 15% margin |
|---|---|---|---|
| 250 gpm @ 100 psi | 14.6 hp | 20.8 bhp | 25 hp (18.5 kW) |
| 500 gpm @ 100 psi | 29.2 hp | 41.7 bhp | 50 hp (37 kW) |
| 750 gpm @ 125 psi | 54.7 hp | 78.1 bhp | 100 hp (75 kW) |
| 1,000 gpm @ 125 psi | 72.9 hp | 104.2 bhp | 125 hp (93 kW) |
| 1,500 gpm @ 150 psi | 131.3 hp | 187.5 bhp | 250 hp (186 kW) |
| 2,000 gpm @ 150 psi | 175.0 hp | 250.0 bhp | 300 hp (224 kW) |
Brake power usually peaks between 120% and 150% of rated flow, which is why the calculator adds a driver margin to the rated-point figure; the manufacturer's curve gives the real maximum. Diesel engines are derated 3% for every 1,000 ft (305 m) above 300 ft (91 m) altitude and 1% for every 10 °F (5.6 °C) above 77 °F (25 °C).
The pressure maintenance (jockey) pump makes up small leaks so the fire pump does not start on a slow pressure drop. NFPA 20 does not fix its size; a flow of about 1% of the fire pump rating — enough to replace the allowable leakage — at a pressure slightly above the fire pump churn pressure is the usual choice. The Annex of NFPA 20 gives the settings the calculator uses:
Friction loss comes from the Fire Hydraulic Calculator, the demand from the Sprinkler Density or Standpipe calculators, and the suction supply from the Fire Water Tank Calculator or a hydrant flow test. For the room itself, see the fire pump room detailed drawing.
Add the pressure required at the most remote outlet, the elevation pressure (0.433 psi per foot or 0.098 bar per metre of height) and the friction loss at the demand flow, then subtract the suction pressure available at the pump at that flow. For example 65 + 17.3 + 15 − 5 = 92.3 psi; with a 10% margin and rounding, a 105 psi pump.
NFPA 20 lists rated capacities of 25, 50, 100, 150, 200, 250, 300, 400, 450, 500, 750, 1,000, 1,250, 1,500, 2,000, 2,500, 3,000, 3,500, 4,000, 4,500 and 5,000 gpm. Pressure ratings are not standardised; each manufacturer offers a range for every capacity.
Yes. NFPA 20 permits a pump to supply a demand of up to 150% of its rated capacity, because every listed pump must deliver at least 65% of rated pressure at 150% of rated flow. A 500 gpm demand can therefore be met by a 400 gpm pump if the pressure at that point on the curve is still enough, but there is no reserve for future changes.
Churn, or shutoff, pressure is the pressure the pump develops at zero flow. NFPA 20 limits it to 140% of the rated pressure; real pumps are typically 110–125%. Churn plus the highest static suction pressure is the maximum pressure the system sees and must not exceed the pressure rating of the components.
Water horsepower is gpm × psi ÷ 1,714. Divide by the pump efficiency for brake horsepower. A 500 gpm, 105 psi pump at 70% efficiency needs 500 × 105 ÷ 1,714 ÷ 0.70 = 43.8 bhp at the rated point. The driver must cover the highest brake power anywhere on the curve, which is usually 10–20% more, so a 60 hp motor would be selected.
NFPA 20 does not give a size. A common rule is about 1% of the fire pump rated flow — 5 gpm for a 500 gpm pump — which is enough to make up the allowable leakage, at a discharge pressure equal to the fire pump churn pressure plus the static suction pressure. It should not be large enough to supply a single sprinkler, or the fire pump would never start.
Following the NFPA 20 Annex: set the jockey pump to stop at the fire pump churn pressure plus the minimum static suction pressure, to start 10 psi below that, and set the fire pump to start 5 psi below the jockey start. With a churn pressure of 126 psi and 10 psi suction that is 136, 126 and 121 psi.
Results are preliminary engineering estimates. The edition of each standard adopted locally, the product listings and the authority having jurisdiction govern the final design.