EV Charger Load Calculator 🔌

Size the electrical supply for EV chargers in car parks, buildings and charging hubs. Add AC and DC chargers, and the calculator balances them across the phases, then sizes the main breaker, each branch breaker and the transformer to NEC 625 or IEC 60364-7-722, with or without a load management system.

🧮 Inputs

Chargers
Charger typeQty
Load management & supply
Auto calculate enabled (no Calculate button).
Main Breaker
—
—
Connected Load
—
—
Design Load
—
—
Transformer
—
—

Preliminary sizing. Cable sizes, voltage drop, short-circuit ratings and selectivity must be checked separately, and the charger manufacturer's installation data and local utility rules apply.

Charger Circuits

How EV Charger Load Is Calculated

An EV charger draws close to its full rated current for hours at a time, so electrical codes treat it as a continuous load and do not let you assume that only some chargers run at once, unless a load management system enforces it. The calculation is therefore simple but strict:

  1. Current per charger: AC chargers draw their rated current (for example 32 A). A DC fast charger draws its output power divided by its efficiency (about 95%), the supply voltage and the power factor.
  2. Phase balancing: single-phase chargers on a three-phase supply are spread over L1, L2 and L3 in turn; three-phase chargers load all three.
  3. Design current: the highest phase current, or the load management limit if one is installed.
  4. Breaker: under the NEC, at least 125% of the design current (continuous load, NEC 625.41). Under IEC, at least the design current.
  5. Transformer: design kVA plus the existing building demand and spare capacity, rounded up to a standard size.

NEC Rules for EV Chargers

The NEC has no demand factor for EV chargers. Without load management, every charger counts at full rating.

IEC 60364-7-722 Rules

Worked Example (default)

Ten 7.4 kW single-phase AC chargers (32 A) and two 50 kW DC chargers on a 400 V three-phase supply, no load management:

  • Single-phase chargers spread 4 / 3 / 3 over L1, L2, L3: 128 A, 96 A, 96 A
  • Each DC charger: 50 kW ÷ 0.95 = 52.6 kW from the grid → 52,632 ÷ (√3 × 400 × 0.98) = 77.5 A per phase, 155 A for two
  • Highest phase current: 128 + 155 = 283 A → main breaker 315 A (IEC)
  • Transformer: √3 × 400 × 283 = 196 kVA, + 20% spare = 235 kVA → 250 kVA

With a load management system limited to 150 kW, the design current drops to 221 A and a 250 A breaker is enough. Under the NEC the same loads need breakers rated 125% of these currents.

Size each charger cable with the Cable Size Calculator and check the feeder with the Voltage Drop Calculator. For the transformer itself see the Transformer Sizing Calculator.

FAQ

How do you calculate the load for EV chargers?

Add the rated current of every charger on each phase (AC chargers at their rated amps, DC chargers at output power ÷ efficiency ÷ voltage), take the highest phase current, and size the breaker at 125% of it under the NEC or at least equal to it under IEC. Only a load management system lets you use a lower figure.

What size breaker do I need for a 7 kW EV charger?

A 7.4 kW charger draws 32 A on 230 V. Under IEC a 32 A or 40 A breaker with a Type A RCD and 6 mA DC detection is typical. A 7.7 kW charger at 240 V under the NEC draws 32 A and needs a 40 A breaker (125%).

Can I apply a diversity factor to EV chargers?

Not without load control. IEC 60364-7-722 takes the diversity factor as 1 unless load control is installed, and the NEC has no demand factor for EVSE; NEC 625.42 lets you use the limit of an automatic load management system instead.

What RCD is needed for an EV charger?

Under IEC 60364-7-722 each charging point needs its own RCD of at least Type A, 30 mA, plus protection against DC fault current: a Type B RCD, or Type A with a 6 mA DC detection device, unless the charger has it built in.

Why balance single-phase chargers across phases?

Because the breaker and transformer are sized on the most loaded phase. Ten single-phase chargers all on one phase would need three times the capacity of the same chargers spread evenly over three phases.

📚 References

  • NFPA 70 National Electrical Code: 625.41 overcurrent protection (125%), 625.42 rating and load management, 220.57 EVSE load
  • IEC 60364-7-722: Requirements for special installations – Supplies for electric vehicles (diversity, RCD and DC fault protection)
  • IEC 61851-1: Electric vehicle conductive charging system – General requirements

Comments

0 comments

Found a number that looks wrong, or a case the tool does not cover? Say so here — corrections are welcome and get answered.